STRUCTMAN

STRUCTMAN

STRUCTMAN is used to Track, Monitor, Control, Analyze and Report Structural Steel progress at different stages like Tendering, MTO (Material Tack Off), Ordering, Manufacturing, Assembly, Erection, Variance, Reconciliation etc.

STRUCTMAN has the following features:

ENGINEERING

PROCUREMENT

SHOP FABRICATION, ASSEMBLY & DELIVERY

ERECTION AT SITES (FIELDS)

PROJECT CONTROL ACTIVITIES

TRACKING AND MONITORING THRU RFID / BARCODES

  • Intelligent way of Coding of all Structural Steel Items
  • Software has Facility / Provision to upload Tender, MTO and AFC Qty. for Structural Steel items.
  • Engineering MTO Analysis w.r.t Tender as well as AFC Qty. (Approved for Construction) at item level.
  • Generation of Summarized Report in Tabular Form for comparison of Tender, MTO & AFC Qty.
  • Generation of Variance Statement for Management Approval to manage the Contracts as per terms and conditions. It will also help in updation of Estimated Budget, Budget Forecast and Cost Control.
  • Facility to upload Structural Master Data with break-up details like WBS number, Unit No., GA Drg. No., Fabrication Drg. No., Assembly No., No. of Assemblies, Weight of Assembly and so on.
Provision to define Procurement activities like:
  • MR
  • RFQ
  • Bid Receipt
  • Evaluation
  • Recommendation
  • Order Placement
  • Inspection and Testing
  • Manufacturing & Delivery
Provision to define Structural Fabrication and Assembly activities like:
  • Sub-ordering of Materials (if applicable)
  • Receipt of Materials
  • Manufacturing
  • Assembly
  • Inspection and Testing
  • Despatch and Receipt at Site
Provision to define Structural Erection activities like:
  • IRN (inspection release note for Assemblies fabricated by Fabrication Contractor)
  • Material Shipped / Dispatched from Structural Fabrication Contractor
  • Material Received at Site (receipt of fabricated Assemblies at site)
  • Material Issued (issuance of fabricated Assemblies to Erection Contractor)
  • Erection of Assemblies
  • Alignment, Grouting & Bolting
  • Fire Proofing
  • Painting
  • QC final clearance etc.
  • Progress monitoring on Quantitative / Efforts (Man-hour) / Cost basis
  • Activity-wise Planning, Scheduling, Monitoring and Progress Reporting
  • Reporting at different levels like WBS, Unit and Complex levels, with activity-wise breakups with Trends / Profiles
  • Calculation of %age Progress for each phase with Forecast / Curves
  • Generation of reports in .xlsx,pdf,.txt formats for ease of customizing
Latest RFID / Barcode Technology can be used for Tracking and Progress Monitoring at various stages like:
  • Receipt of Fabricated Assemblies at Sites
  • Allocate Storage Space to Assemblies and identify Location
  • Issuance of Fabricated Assemblies to Erection Contractor
  • Erection Progress etc.